Infrastructure Ontario (IO) and Metrolinx have received two bids for the second tunnel package on the Eglinton Crosstown West Extension (ECWE).
The two teams, consisting of an Acciona-GIP Joint Venture (AGJV) and Strabag, were shortlisted after a request for qualification process earlier this year.
The winner will design, build and finance a 500-metre tunnel that will start east of Jane Street and connect to the future Mount Dennis Station.
A winner is expected to be announced in Spring 2023.